Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 32 results ...

Aboukhadra, W (2021) Learning organisation, affective commitment and cultural intelligence: the case of expatriates in the Gulf Co-operation Council countries, Unpublished PhD Thesis, , Nottingham Trent University.

Adnan, H B (2004) Joint venture projects in Malaysian Construction Industry Factors Critical to success, Unpublished PhD Thesis, School of Property and Construction, Nottingham Trent University.

Agyekum-Mensah, G (2013) The development of an innovative sustainable total planning and control system for construction projects, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Ahmed Namadi, S i (2019) A framework for collaborative costing in the UK construction industry, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Alharbi, F (2020) Critical delay factors in housing construction projects in Saudi Arabia: Assessment and solutions, Unpublished PhD Thesis, , Nottingham Trent University.

Asnaashari, E (2011) A holistic conceptual model for managing construction logistics in building projects: the case of Iran, Unpublished PhD Thesis, School of Science and Technology, Nottingham Trent University.

Boyal-Seth, H (2011) Assessing the business case for supplier diversity in the construction housing sector, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Coupar, G (2009) Modern approaches to repairs and maintenance procurement within the social housing sector, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

  • Type: Thesis
  • Keywords: client; effectiveness; maintenance; procurement; repair
  • ISBN/ISSN:
  • URL: http://irep.ntu.ac.uk/id/eprint/26/
  • Abstract:
    This document represents the final stage of a research project assessing the relevance of modern procurement approaches within the context of repairs and maintenance to social housing providers. Previous documents in this study are suggestive that there are some limitations for the effectiveness of social housing providers to undertake the role of construction client. This in turn would appear to question the relevance of the procurement approach. In accepting this contention, this phase of the research applies a semi-structured framework in which the role of the client is targeted and measured along with the assessment of if or how the role of the contractor could alter in order to potentially achieve enhanced relevance. Over a twelve month time span, a number of identified ‘intervention strategies’ were developed by a small group of senior practitioners. The rationale was to apply the identified strategy to a small sample in order to ascertain if there was any consequence of the trial. The usage of a research methodology that enables a number of cycles and iterations would also allow for modifications to be made to further enhance the intervention measures. Having completed three cycles of applying the strategies and reflecting upon the outcome observed, this document notes the continuing challenge that modern procurement routes appear to bring.

Daniel, E I (2017) Exploratory study into the use of Last Planner® System and collaborative planning for construction process improvement, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Dowd, V G (1999) The pervading role of risk allocation as the link mechanism between factors of influence and construction procurement practices adopted in the UK construction industry over the period 1965-1995, Unpublished PhD Thesis, , Nottingham Trent University.

Dupin, P (2021) Using pull and flow systems to improve production stability in real estate development projects, Unpublished PhD Thesis, , Nottingham Trent University.

Grada, M (2007) The impact of economic value added measure in assessing the business performance of UK construction companies, Unpublished PhD Thesis, , Nottingham Trent University.

Hackett, V (2017) The impact of a collaborative planning approach on engineering construction performance, Unpublished PhD Thesis, , Nottingham Trent University.

Hamza, A (2002) Partnering in the construction industry: an empirical investigation into the critical success factors, Unpublished PhD Thesis, School of Property and Construction, Nottingham Trent University.

Hurst, A G (2009) Management education, training and development of construction managers: will they ever learn?, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Idan, C K (2003) Quality function deployment (QFD) in the UK construction industry, Unpublished PhD Thesis, , Nottingham Trent University.

Jaafar, T (1992) A unified methodology for project planning risk, Unpublished PhD Thesis, , Nottingham Trent University.

Jackson, F (2006) Biodegradable hydraulic fluids: Reducing oil-related pollution in the construction industry, Unpublished PhD Thesis, , Nottingham Trent University.

Keats, R J (2014) An exploration of how professional associations advance innovation and promote innovation pedagogy, Unpublished PhD Thesis, , Nottingham Trent University.

Khadour, L (2010) Total quality environmental management framework towards sustainability (UK novated D&B principal contractors), Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Khalid, U (2022) Investigation into the development of a human reliability analysis framework for the safety management of construction projects, Unpublished PhD Thesis, , Nottingham Trent University.

Kings, S (2002) Pricing documentation for contractors' estimators: Establishing a more effective approach, Unpublished PhD Thesis, , Nottingham Trent University.

McLean, M (2014) A longitudinal analysis of a partial mediation model of employee engagement in a knowledge-intensive firm, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Musa, M M (2019) A framework for implementing target value delivery to enhance value creation in the construction industry, Unpublished PhD Thesis, , Nottingham Trent University.

Owen, K J (2002) Success factors in the procurement of privately financed tolled transportation infrastructure projects in the UK, Unpublished PhD Thesis, School of Property and Construction, Nottingham Trent University.

Payne, B (1998) Project risk analysis, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Pritchard, C (2005) Skin cancer prevention in the house building industry, Unpublished PhD Thesis, , Nottingham Trent University.

Rashid, K B A (1998) The processes of construction procurement in Malaysia: Identification of constraints and development of proposed strategies in the context of 'vision 2020', Unpublished PhD Thesis, , Nottingham Trent University.

Sarhan, S (2018) Institutional waste within the UK construction industry: an exploratory study, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Sharif, A (1996) A functional analysis of building procurement systems and strategies in an international context, Unpublished PhD Thesis, , Nottingham Trent University.

Taylor, M S (2021) Strategic management accounting practices in medium sized UK construction companies: a mixed-methods approach, Unpublished PhD Thesis, , Nottingham Trent University.

Ward, A D (2016) Development of a contextualised understanding of the diffusion of innovation among quantity surveyors in the UK construction industry, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.